Project - Wainui Golf Course

Wainui Golf Course

The project was to develop a new Golf Course for the existing Peninsula Golf Club to relocate to. Dodd Civil Consultants were responsible for all Civil design work and contract administration for the main Civil contract. 
PANORAMIC VIEW OF PROGRESS ONSITE 2014 - 2016

THE PROJECT

The project included the Civil design for: 
  • Strip and replace topsoil - 80,000m3
  • Bulk earthworks - 250,000m3
  • Sediment control
  • 25km of subsoil drainage 
  • 31km of water supply pipes 
  • 500m of public road upgrading 
  • Significant sewer and stormwater reticulation 
  • Clubhouse carparking 
  • Large culvert design 
  • Pond design - ornamental and storage for irrigation, approximately 1Ha
The project also included: 
  • Contract administration
  • Certification of payments
  • Certification of quality on Civil items
  • Ensuring construction met the programming requirements 

CHALLENGES & SOLUTIONS

Maintaining construction to the required programme required input along with managing the onsite ground conditions which were typical for "Lime Country" with poor drainage. A separate part to this project was the creation of a 16 lot residential and 9 Lifestyle block subdivision alongside the golf course, constructed in conjunction with the golf course works. 
This project was delivered on time with the transition of the Golf Club following the required programme. 
 I recommend Dodd Civil Consultants to any prospective Client.
- Ian Wearing, Temperzone
Share by: